1. 99.98%. We find it very easy to operate there and normally
maintain based on a twenty minute smoothed value (automatically
calculated by COLSS).
2. Combination. We use COLSS (Core Operating Limits Supervisory
System) which calculates secondary calorimetric every thirty seconds and
primary calorimetric every second. Turbine first stage pressure power
is also updated once per second.
3. Don't know.
4. No.
5. No.
Clint Alday
Waterford 3
-----Original Message-----
From: pwrrm-bounces(a)retaqs.com [mailto:pwrrm-bounces@retaqs.com] On
Behalf Of WILLETT, JOSEPH E
Sent: Wednesday, January 10, 2007 3:01 PM
To: pwrrm(a)retaqs.com
Cc: BLESSIE, WILLIAM J
Subject: [Pwrrm] Reactor Power Control, Expectaions and Performance
Fort Calhoun Station is currently experiencing 3-5 MWth swings
(peak-to-peak) in a one hour period to on our secondary calorimetric
calculation. This last outage we replaced both S/Gs and refurbished our
FW regulation valves. Prior to this outage our swings were normally 1
MW over 4 hour period. We attempt to keep power at a corporate goal of
1498 MWth (1500 MWth is our rated power level). We do not see these
swings on the NI or Delta-T power indications that follow the secondary
calorimetric swings.
We have not implemented Appendix K using ultrasonic flow measurement for
feedwater as of yet.
Our Question(s)
1) What are other plants goals/expectations for maintaining power level?
(=/- MW or goal); How easy is it to maintain?
Is there a band within which you operate?
2) How is your secondary calculation performed? (Averaging Inputs,
Instantaneous values, combination) Is it a module
or program on you plant computer or is it an off-line routine?
3) Are your temperature and flow transmitters set specifically for this
calculation? (dampening or bias settings)
4) Are any of your control loops (Feedwater) used in the secondary
calorimetric calculation?
5) Have you had any issues related to power swings or related to your
secondary calorimetric?
J. E. Willett
"Only those who will risk going too far can
possibly find out how far one can go."
T.S. Eliot (1888-1965)
----------------------------------------------------
Joseph E. Willett, P.E.
Principal Reactor Engineer, Nuclear Operations
E-mail: jwillett(a)oppd.com <mailto:jwillett@oppd.com%20> OR
Joseph_Willett(a)hotmail.com <mailto:jwillett@uswest.net%20>
Omaha Public Power District Phone: (402)
533-7213
P.O. Box 399
Pager: (402) 561-3899
Ft. Calhoun, NE 68023-0390 FAX:
(402) 533-6747
Mail Station: FC-1-1 Plant
This e-mail contains Omaha Public Power District's confidential and
proprietary information and is for use only by the intended recipient.
Unless explicitly stated otherwise, this e-mail is not a contract offer,
amendment, nor acceptance. If you are not the intended recipient you
are notified that disclosing, copying, distributing or taking any action
in reliance on the contents of this information is strictly prohibited.