I am wondering: how other sites would have classified exceeding DNB margin in reactivity management space.?
Details: The plant had tripped with the TCBs closed when the cold leg temperature was exceeded. The temperature was exceeded for less than 10 seconds. The Technical Specification action statement was met in the specified time. The event was originally graded as an incident.
Also, does your site consider the Tech Spec on DNB a reactivity management TS?
Thank you in advance!
Adina LaFrance
The significant problems we face cannot be solved at the same level of thinking we were at when we created them. -Albert Einstein
Nuclear Analysis & Fuel
Reactor Engineer
Surry Power Station
Email: Adina.K.LaFrance(a)Dom.com<mailto:Adina.K.LaFrance@Dom.com>
Phone: 757-365-2658
Pager #: 4290
CONFIDENTIALITY NOTICE: This electronic message contains
information which may be legally confidential and or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect. The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized. If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful. If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it. Thank you.