Our Fleet RM Team would like to know how other sites would
classify/grade the following event:
During the initial power escalation following a refueling
outage, QPTR alarms required a flux map to verify quadrant power tilt and
allow for new currents to be installed to clear the alarm. Originally, the hot
channel factors surveillance was to be performed at 73% (the next scheduled
flux map) but was performed at ~50%. If the 50% map had passed all acceptance
criteria, the 73% map would not have been required and all restrictions based
on hot channel factors would have been removed all the way to full power; other
hold points would have still been required. The power ascension procedure
states that the acceptance criteria for the Intermediate Power (40% to 75%) map
to be the technical specification on hot channel factors, which references the
COLR limit: “Once after each refueling prior to exceeding 75% RATED POWER
and every 31 effective full power days thereafter” the FQN transient
needs to be confirmed within limits.
During the power ascension, it was decided to confirm the
FQN transient using the 50% map to allow for power to be increased >75%. FQN
transient was determined to be outside the COLR limits, which caused the
entry into the TS action statement. The calculated
margin was -1.701% based on a measured value with uncertainties of 5.085
compared to the limit of 5.00.
As a result, the
following actions were required:
-Reduce the AFD limits greater than or equal to 1% for each
1% that the FqN transient exceeds its limits within 4 hours after this
determination has been made.
-Similarly reduce the Power Range Neutron Flux-High Trip Setpoints
and Overpower delta-T Trip Setpoints within 72 hours by greater than or equal
to 1% that maximum allowable power of the axial flux difference limits is
reduced.
A WO was made for
I&C to make adjustments to the Power Range Neutron Flux-High Trip Setpoints
and OPDT Trip Setpoints as specified above.
Prior to completing the WO, the flux map at 73% power
determined that there was no need to Reduce Overpower Delta T trip setpoints
and the WO was canceled. It was noted that the ~50% map was not originally
planned and would not have been performed except for the QPTR alarms-instead
the 73% would have been performed.
1) How would your site classify the above
event in reactivity management space (precursor, incident, event…)?
2)
What
is the justification for the grading (the example or statement from your
procedure with your grading requirements)?
Thank you in advance.
Adina
LaFrance
The significant problems we face cannot be solved at the same
level of thinking we were at when we created them. -Albert Einstein
Nuclear
Analysis & Fuel
Reactor
Engineer
Surry
Power Station
Email:
Adina.K.LaFrance@Dom.com
Phone:
757-365-2658
Pager
#: 4290