At Duke / Oconee – level of review is with the shift supervisors (Control Room SRO) with no thresholds for higher levels of review.  Also, we haven’t defined to any great detail when the plan should be revised; typically, the plan is revised when the narrative of the plan doesn’t reflect reality.  We do differentiate between the “plan” and the “prediction” and will update the prediction with actual boron, times for power changes and other minor variations within the plan (in the broad sense).

 

Ramp rate limits are in the technical procedure for conducting a maneuver. Operators are trained on them. We haven’t been able to get the plant computer changed to incorporate the ramp rates for an alarm or constrain the control system to not allow power changes greater than the ramp rate restrictions (yet).

 

Carl

 

Carl D. Fago

Reactor Engineering Supervisor

Oconee Nuclear Station

Duke Energy

 

864-885-3047

cdfago@duke-energy.com

 


From: pwrrm@retaqs.com [mailto:pwrrm@retaqs.com] On Behalf Of Adina.K.Lafrance@dom.com
Sent: Monday, June 30, 2008 9:20 AM
To: pwrrm@retaqs.com
Subject: [Pwrrm] Reactivity plan approval and revisions/ramp rate alarm

 


SOER 07-01 recommendation 3 stated that "plans for significant reactivity changes are reviewed and approved by appropriate station and shift operations management..." and "If plant conditions delay power changes, the reactivity plan is revised to meet the new plant conditions and approved by management".  

Does anyone have specific thresholds for:

1) the level of review a plan requires (such as <10% requires shift supervision, >10% requires shift management, >50% requires station management)

or

2) when a reactivity plan must be revised (such as > 1 hour delay, rods > 10 steps from the predicted value, current power level step >2% from predicted)


Additional question

How do other stations incorporate any ramp rate restrictions that may apply?  (Ramp rate alarm, operator training, ramp plan)

Thank you.  

Adina LaFrance

Nuclear Analysis & Fuel
Reactor Engineer
Surry Power Station
Email: Adina.K.LaFrance@Dom.com
Phone: 757-365-2658
Pager #: 4290
CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.