For Surry: If we drop more than one at power, we trip as well.  If we drop only one, our TS allow us to look at hot channel factors further and (if we meet some conditions) continue operating with a dropped rod (happened in 2006 for 19 days).  If a rod is dropped during a startup or physics testing, the reactor will be tripped.  Following recovery of a dropped rod, the recovery is considered complete when the follow up test to verify that the rod is working properly is complete.  So it wold depend on the failure.  

Adina LaFrance

It's a healthy thing now and then to hang a question mark on the things you have long taken for granted.  -Betrand Russell


Nuclear Analysis & Fuel
Reactor Engineer
Surry Power Station
Email: Adina.K.LaFrance@Dom.com
Phone: 757-365-2658
Pager #: 4290



"WILLETT, JOSEPH E" <jwillett@oppd.com>
Sent by: pwrrm@retaqs.com

11/04/2008 09:02 AM
Please respond to
PWR Reactivity Management <pwrrm@retaqs.com>

To
<pwrrm@retaqs.com>
cc
Subject
[Pwrrm] Definition of When Startup is Complete





FCS has two requirements regarding a dropped rod. First, if we drop more than one rod at power, we trip the reactor. Second, if we drop a single rod during startup, we trip the reactor. What we don't have is a definition of when startup is considered complete, with regards to a dropped rod.

Do other plants have similar requirements and do you have a definition of when startup is complete with regards to a dropped rod?

J. E. Willett

----------------------------------------------------

Joseph E. Willett, P.E.      

Principal Reactor Engineer-Fuel

Nuclear Operations Division

 E-mail: jwillett@oppd.com

  Omaha Public Power District           Phone:  (402) 533-7213

  Fort Calhoun Station                  Pager:   (402) 561-3899

  9610  Power Lane                      FAX:      (402) 533-6747

  Blair, NE  68008

  Mail Station: FC-1-1 Plant

---------------------------------------------------- --------




This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient.  Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance.  If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.

_______________________________________________
PWRRM mailing list
PWRRM@retaqs.com
http://www.keffective.com/mailman/listinfo/pwrrm


CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.