At V.C. Summer our RTP is 2900 MWT. We have a feedwater flow
rate based calorimetric computer program that operates continuously on the
plant process computer. We operate with the goal of maintaining shift average
power at or slightly below RTP based on this program. All of our accident
analyses are based on an approximately ±2% reactor power
uncertainty which is the overall uncertainty of the calorimetric computer
program. This means that actual reactor power could be as high as 2958 or as
low as 2842 MWT when the calorimetric program is indicating 2900 MWT.
Appendix K uncertainties are not intended to be used as
penalties applied to a plant’s licensed thermal power limit.
Bill Bell
Reactor Engineering
803-345-4389
From: pwrrm@retaqs.com
[mailto:pwrrm@retaqs.com] On Behalf Of Adina K Lafrance
Sent: Thursday, January 21, 2010 8:43 AM
To: RETAQS (pwrrm@retaqs.com)
Subject: [Pwrrm] Measured power and uncertanties
Surry is trying to answer
a question this morning regarding power level indications and
uncertainties.
We are stating that within a
certain confidence level, that the calorimetric calculation will produce a reactor
power output (at RTP) from 98.8 to 101.2% with the rightly calibrated process
instrumentation in the calorimetric program (App K). Half the time the
operating power will be above 100%, half the time it will be below 100%.
The opposing opinion is that if we have a 1.2% RTP uncertainty that we operate
at or below 98.8% so as to not exceed RTP. The uncertainties in question
relate to the plant computer-none of the redundant indications indicate higher
than RTP (most notably delta Ts). It is also noted that we were told that
no other site operates the way we are with regard to uncertainties.
Can you please tell us how your
site operates with regard to uncertainties and your RTP?
Thank you in advance.
Adina
LaFrance
The significant problems we face cannot be solved at the same
level of thinking we were at when we created them. -Albert Einstein
Nuclear
Analysis & Fuel
Reactor
Engineer
Surry
Power Station
Email:
Adina.K.LaFrance@Dom.com
Phone:
757-365-2658
Pager
#: 4290
CONFIDENTIALITY NOTICE: This electronic message contains information
which may be legally confidential and or privileged and does not in any case
represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the
sender without an additional express written confirmation to that effect. The
information is intended solely for the individual or entity named above and
access by anyone else is unauthorized. If you are not the intended recipient, any
disclosure, copying, distribution, or use of the contents of this information
is prohibited and may be unlawful. If you have received this electronic
transmission in error, please reply immediately to the sender that you have
received the message in error, and delete it. Thank you.