If you have not yet responded to this survey, please do so
if possible.
FENOC would like to ask that each plant complete the
following survey:
NEW FUEL RECEIPT INDUSTRY SURVEY
Plant:
Contact Information:
Name:
Phone:
E-Mail:
1. What
is the purpose of your new fuel receipt activities? (indicate all that apply)
a. 10CFR50
Appendix B.VII quality inspection?
b. Inspection
for shipping damage and foreign material?
c. Other
(please specify):
2. Which
organizations at your plant perform the following functions relative to new
fuel receipt?
a. Overall
new fuel receipt project management.
b. Ensuring
adequate resources from other groups (Security, Radiation Protection, etc.) are
aligned for new fuel receipt.
c. Ensuring
appropriate Preventative Maintenance has been performed on new fuel receipt
equipment (hoists, bridges, etc.).
d. Providing
supervision of craft personnel (crane and bridge operators, mechanics, etc.)
involved in new fuel receipt.
d. Performing
actual new fuel receipt inspections.
e. Interfacing
with the fuel vendor.
f. Generating
fuel movement control sheets or checklists.
g. Tracking
Special Nuclear Material (including processing of Material Transaction
Reports).
h. Verifying
integrity of shipping vehicle and shipping container accelerometers.
3. What
qualifications are required for individuals performing inspections of new fuel
during new fuel receipt? (indicate all that apply)
a. Part
of reactor engineering qualifications
b. Task-specific
qualification card
c. ANSI
N45.2.6-1978
d. Others
(please specify):
4. What
role does your site/fleet QA or QC organizations play during new fuel receipt?
a. Performs
new fuel receipt inspections.
b. Qualifies
new fuel receipt inspectors.
c. Normal
QA/QC oversight of activities.
d. None.
e. Other
(please specify):