those of you that currently use BEACON-TSM, what was your transition plan for
going from your old system to BEACON-TSM? Did you run both systems in
parallel for a certain amount of time? We currently use BEACON-Incore and
are wondering if we need to run an Incore model on a separate computer at the
same time we are running the TSM model on the new computer.
Thank
you in advance for your input.
Kara Gibson
Xcel Energy | Responsible
By Nature
Reactor Engineer
P: 651.388.1121
x4719 F:
612.330.5743
E: kara.gibson@xenuclear.com