Based on the way we interpreted the PWROG criteria, this would be a level 3 event due to an unplanned entry into reactivity-related TS that was corrected within the time requirements.

 

At FCS, reactivity-related Technical Specifications include Shutdown Margin, Core Reactivity, Moderator Temperature Coefficient, Rod Group Alignment Limits, Rod Group Insertion Limits, Rod Position Indication, Rod Position Indication, Physics Tests Exemptions, Linear Heat Rate, Peaking Factors, DNB, and Tilt.

 

Barton P. Schawe, P.E.

Principal Reactor Engineer

Omaha Public Power District

Tel: 402-533-7211

email: bschawe@oppd.com

From: pwrrm@retaqs.com [mailto:pwrrm@retaqs.com] On Behalf Of Adina K Lafrance
Sent: Tuesday, December 15, 2009 10:34 AM
To: RETAQS (pwrrm@retaqs.com)
Subject: [Pwrrm] RM grading: exceeding DNB

 

I am wondering: how other sites would have classified exceeding DNB margin in reactivity management space.?

 

Details:  The plant had tripped with the TCBs closed when the cold leg temperature was exceeded. The temperature was exceeded for less than 10 seconds. The Technical Specification action statement was met in the specified time.  The event was originally graded as an incident. 

 

Also, does your site consider the Tech Spec on DNB a reactivity management TS? 

 

Thank you in advance!

 

Adina LaFrance

 

The significant problems we face cannot be solved at the same level of thinking we were at when we created them.  -Albert Einstein

 

Nuclear Analysis & Fuel

Reactor Engineer

Surry Power Station

Email: Adina.K.LaFrance@Dom.com

Phone: 757-365-2658

Pager #: 4290

 

 

CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.





This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient.  Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance.  If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.