Based on the way we interpreted
the PWROG criteria, this would be a level 3 event due to an unplanned entry
into reactivity-related TS that was corrected within the time requirements.
At FCS, reactivity-related
Technical Specifications include Shutdown Margin, Core Reactivity, Moderator
Temperature Coefficient, Rod Group Alignment Limits, Rod Group Insertion
Limits, Rod Position Indication, Rod Position Indication, Physics Tests
Exemptions, Linear Heat Rate, Peaking Factors, DNB, and Tilt.
Barton P. Schawe, P.E.
Principal Reactor Engineer
Omaha Public Power District
Tel: 402-533-7211
email: bschawe@oppd.com
From: pwrrm@retaqs.com
[mailto:pwrrm@retaqs.com] On Behalf Of Adina K Lafrance
Sent: Tuesday, December 15, 2009 10:34 AM
To: RETAQS (pwrrm@retaqs.com)
Subject: [Pwrrm] RM grading: exceeding DNB
I am wondering: how other sites would have
classified exceeding DNB margin in reactivity management space.?
Details: The plant had tripped with
the TCBs closed when the cold leg temperature was exceeded. The temperature was
exceeded for less than 10 seconds. The Technical Specification action statement
was met in the specified time. The event was originally graded as an
incident.
Also, does your site consider the Tech Spec on DNB a reactivity management TS?
Thank you in advance!
Adina
LaFrance
The significant problems we face cannot be solved at the same
level of thinking we were at when we created them. -Albert Einstein
Nuclear
Analysis & Fuel
Reactor
Engineer
Surry
Power Station
Email:
Adina.K.LaFrance@Dom.com
Phone:
757-365-2658
Pager
#: 4290
CONFIDENTIALITY NOTICE: This electronic message contains information
which may be legally confidential and or privileged and does not in any case
represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the
sender without an additional express written confirmation to that effect. The
information is intended solely for the individual or entity named above and
access by anyone else is unauthorized. If you are not the intended recipient,
any disclosure, copying, distribution, or use of the contents of this information
is prohibited and may be unlawful. If you have received this electronic
transmission in error, please reply immediately to the sender that you have
received the message in error, and delete it. Thank you.
This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient. Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. |