V. C. Summer has been
conducting the Shutdown and Control Rod Drop Timing Technical Specification
required surveillance using the plant process computer since 1991. Prior
to that a strip chart recorder (Visicorder) was used to perform this test.
A condition report was recently initiated that asks whether or not this is an
appropriate method of testing. The Visicorder was a calibrated field
standard while the plant computer is not. We are now trying to determine
how to demonstrate the timing accuracy of the plant computer for use in rod drop
testing.
1. Does your plant
use the plant computer or another computer for rod drop testing? If yes do
you perform any type of timing accuracy test for such a computer and how do you
perform such a test.
2. If you do not use
a computer to perform rod drop testing what method do you use to confirm you
meet the required rod drop time?
Please email or call
Bill Bell with your response to this survey.
William H. Bell,
PE
Chemical
Engineer
Reactor
Engineering
V. C. Summer
Station
South Carolina
Electric & Gas Co.
803-345-4389