I am wondering: how other sites would have
classified exceeding DNB margin in reactivity management space.?
Details: The plant had tripped with
the TCBs closed when the cold leg temperature was exceeded. The temperature was
exceeded for less than 10 seconds. The Technical Specification action statement
was met in the specified time. The event was originally graded as an
incident.
Also, does your site consider the Tech Spec on DNB a reactivity management TS?
Thank you in advance!