Following a refueling outage, the return to service operating procedure of the Chemical Volume Control System Blender has Operations and I&C set up the blender to obtain the correct boron concentration.  The potentiometers are set and FCVs adjusted to obtain near the set point, best as possible. However, there are no acceptance values in the procedure. It has been a judgement call by the Operations staff. For other sites, what is the criteria and/or process for the return to service of the blender? If there are acceptance values, what are they?

Thank you.  


Adina LaFrance

It's a healthy thing now and then to hang a question mark on the things you have long taken for granted.  -Betrand Russell


Nuclear Analysis & Fuel
Reactor Engineer
Surry Power Station
Email: Adina.K.LaFrance@Dom.com
Phone: 757-365-2658
Pager #: 4290

CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.