All,

 

At Kewaunee, we’re considering a change from the standard bridge pattern of core on-load to a modified crescent.  I have the following questions for the industry:

1.        What core loading pattern do you use? 

2.       Do you use software/equipment to physically measure the gaps between assemblies?

3.       If so, what is the software/equipment?

 

Thank you in advance for any information you can offer.

 

Jeremy Custer

Reactor Engineer

Kewaunee Power Station

Phone:  920-388-8778

Pager:  920-305-0119

 


CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.