Callaway conducts periodic measurements of B-10 content in applicable tanks and adjusts minimum Boron concentration limits accordingly. An example from the site procedure is quoted below.

Jim McInvale

 

 

Operating limits and control bands are set to compensate for depletion of B-10 due to use of

recycled boric acid. The lower operating limit, 2030 ppm, compensates for a potential B-10

level in the RWST of 19.6%, making it equivalent to 19.9 atom %. Yearly analyses of B-10

in the RWST will be performed to verify and track the changes in B-10 level. This new

operating limit is more conservative than the T/S requirement of 2000 ppm B.

 


From: pwrrm@retaqs.com [mailto:pwrrm@retaqs.com] On Behalf Of Kenneth R Pike
Sent: Wednesday, July 08, 2009 9:16 AM
To: pwrrm@retaqs.com
Subject: [Pwrrm] RCS B10 depletion impact on Boron Inj Safety Systems?

 

In developing a B10 depletion lesson recently I discovered a concern that I have not seen raised before. Does your Safety Analysis for your boron injection or S/D systems (Accumulators, Boron Injection Tank or RWST) consider anything less than nominal B10 abundance (19.9 a/o) in the boron ppm requirement? If the analysis assumes nominal B10 and there is some B10 depletion then the negative reactivity assumed could be more than that actually available (non-conservative) upon injection. Is this accounted for in some fashion?

 

Thanks in advance

 

 


Ken Pike 

Retaqs, Inc.

610.277.8991 x 253


******************************* The information contained in this message may be privileged and/or confidential and protected from disclosure. If the reader of this message is not the intended recipient, or an employee or agent responsible for delivering this message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. Note that any views or opinions presented in this message are solely those of the author and do not necessarily represent those of Ameren. All emails are subject to monitoring and archival. Finally, the recipient should check this message and any attachments for the presence of viruses. Ameren accepts no liability for any damage caused by any virus transmitted by this email. If you have received this in error, please notify the sender immediately by replying to the message and deleting the material from any computer. Ameren Corporation *******************************


_______________________________________________
PWRRM mailing list
PWRRM@retaqs.com
http://www.keffective.com/mailman/listinfo/pwrrm



No virus found in this incoming message.
Checked by AVG - www.avg.com
Version: 8.5.375 / Virus Database: 270.13.8/2224 - Release Date: 07/08/09 05:53:00