Good Afternoon,
Attached to this email is a
document that contains a Surry OE that was generated by our Corporate personnel
regarding source range detector response during Core Onload (Basically, the SRD
indication for an elevated count rate would still occur but could be later than
expected). If you have not yet read this, please take the time to do so. Once
read, please answer the following questions to the best of your ability:
Is your plant aware of this? If so, have you done
anything to safeguard against a potential core misloading and/or a boron dilution
event?
At Surry Power Station, during cold shutdown a dilution is
prevented by closing the demin water valve. Surry will also be taking a
look at our historical source range detector response and come up with a lesser
1/M stop criteria during onload. We will also be providing training to
Operations and Fuel Handling so that they are aware of this condition.
If you require more information on this OE, please do not
hesitate to contact me.
__________________________________________________________
Charlene Chotalal
Lead Reactor Engineer
Surry Power Station
Dominion Generation
Work: (757)-365-2819