NEW FUEL
RECEIPT INDUSTRY SURVEY
Plant: Catawba
Nuclear
Station
Contact Information:
Name: Eric R.
Pace
Phone: 803-701-2447
E-Mail: ERPac2@duke-energy.com
1.
What is the purpose of your new fuel receipt activities? (indicate all that
apply)
a. 10CFR50 Appendix B.VII
quality inspection? YES
b. Inspection for shipping
damage and foreign material? YES
c. Other (please specify):
2.
Which organizations at your plant perform the following functions relative to
new fuel receipt?
a. Overall new fuel receipt
project management. Reactor Engineering
b.
Ensuring adequate resources from other groups (Security, Radiation Protection,
etc.) are aligned for new fuel receipt. Reactor
Engineering
c.
Ensuring appropriate Preventative Maintenance has been performed on new fuel
receipt equipment (hoists, bridges, etc.). Reactor
Engineering/Fuel Handling Maintenance Crew
d.
Providing supervision of craft personnel (crane and bridge operators,
mechanics, etc.) involved in new fuel receipt. Fuel
Handling Maintenance Crew
d.
Performing actual new fuel receipt inspections. Reactor
Engineering
e.
Interfacing with the fuel vendor. Reactor
Engineering
f.
Generating fuel movement control sheets or checklists. Reactor Engineering
g.
Tracking Special Nuclear Material (including processing of Material Transaction
Reports). Reactor Engineering
h.
Verifying integrity of shipping vehicle and shipping container
accelerometers. Radiation Protection and
Shipping Services verify the cleanliness and integrity of the shipping
vehicle. Fuel Handling Maintenance Crew and Radiation Protection checks
the shipping container accelerometers
3.
What qualifications are required for individuals performing inspections of new
fuel during new fuel receipt? (indicate all that apply)
a.
Part of reactor engineering qualifications Unofficially – Not a duke
policy to qualify every Reactor Engineer to fuel inspections, more of a group expectation
that all members in group know this skill
b. Task-specific qualification
card No, duke engineers qualify to perform
processes, not tasks
c. ANSI
N45.2.6-1978 YES
d. Others (please specify):
4.
What role does your site/fleet QA or QC organizations play during new fuel
receipt?
a. Performs new fuel receipt
inspections. NO
b. Qualifies new fuel receipt
inspectors. YES
c. Normal QA/QC oversight of
activities. NO
d. None.
e. Other (please
specify): QA/QC Organization trains Reactor
Engineer to be a task specific QA/QC Inspector for fuel receipt
Thank you,
Eric
R. Pace
Engineer
I
Reactor
Engineering
Catawba
Nuclear Station
803-701-2447