Fort Calhoun performs two verifications first in the SFP following CEA Shuffle.
 
Second, core verification is performed following core reload using a PTZ camera. The verification of 133 fuel assemblies takes two(2) hours, including camera setup after reload is complete. We have an RE and an STA or RE-alternate on the refueling machine. QA usually observes. Fuel assembly IDs orientation and core location are read by one person and confirmed by the other that verifies correct core location, ID and orientation.
 
Prior to the serial number verification, FCS utilizes refueling machine mast camera to perform the alignment verification, which also takes about two(2) hours.
 
 
J. E. Willett
 
----------------------------------------------------
Joseph E. Willett, P.E.      
Principal Reactor Engineer-Fuel
Nuclear Operations Division
 
E-mail: jwillett@oppd.com
 
  Omaha Public Power District           Phone:  (402) 533-7213
  Fort Calhoun Station                  Pager:   (402) 561-3899
  9610  Power Lane                       FAX:      (402) 533-6747
  Blair, NE  68008
  Mail Station: FC-1-1 Plant
---------------------------------------------------- --------
 
 
 




This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient.  Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance.  If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.