1. 99.98%.  We find it very easy to operate there and normally maintain based on a twenty minute smoothed value (automatically calculated by COLSS).
  2. Combination.  We use COLSS (Core Operating Limits Supervisory System) which calculates secondary calorimetric every thirty seconds and primary calorimetric every second.  Turbine first stage pressure power is also updated once per second.
  3. Don’t know.
  4. No.
  5. No.

 

Clint Alday

Waterford 3

 

-----Original Message-----
From: pwrrm-bounces@retaqs.com [mailto:pwrrm-bounces@retaqs.com] On Behalf Of WILLETT, JOSEPH E
Sent:
Wednesday, January 10, 2007 3:01 PM
To: pwrrm@retaqs.com
Cc: BLESSIE, WILLIAM J
Subject: [Pwrrm] Reactor Power Control, Expectaions and Performance

 

Fort Calhoun Station is currently experiencing 3-5 MWth swings (peak-to-peak) in a one hour period to on our secondary calorimetric calculation. This last outage we replaced both S/Gs and refurbished our FW regulation valves.  Prior to this outage our swings were normally 1 MW over 4 hour period. We attempt to keep power at a corporate goal of 1498 MWth (1500 MWth is our rated power level). We do not see these swings on the NI or Delta-T power indications that follow the secondary calorimetric swings.

 

We have not implemented Appendix K using ultrasonic flow measurement for feedwater as of yet.

 

Our Question(s)

 

1) What are other plants goals/expectations for maintaining power level? (=/- MW or goal); How easy is it to maintain?

    Is there a band within which you operate?

2) How is your secondary calculation performed?  (Averaging Inputs, Instantaneous values, combination) Is it a module

    or program on you plant computer or is it an off-line routine?

3) Are your temperature and flow transmitters set specifically for this calculation? (dampening or bias settings)

4) Are any of your control loops (Feedwater) used in the secondary calorimetric calculation?

5) Have you had any issues related to power swings or related to your secondary calorimetric?

 

J. E. Willett

"Only those who will risk going too far can
  possibly find out how far one can go."

T.S. Eliot (1888-1965)
----------------------------------------------------
Joseph E. Willett,  P.E.      
Principal Reactor Engineer, Nuclear Operations

 E-mail: jwillett@oppd.com OR Joseph_Willett@hotmail.com

  Omaha Public Power District                             Phone:  (402) 533-7213
  P.O. Box 399                                                              Pager:   (402) 561-3899
  Ft. Calhoun, NE  68023-0390                                FAX:      (402) 533-6747
  Mail Station: FC-1-1 Plant

 

 



This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient.  Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance.  If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.