FENOC would like to ask that each plant complete the
following survey:
NEW FUEL RECEIPT INDUSTRY SURVEY
Plant:
Contact Information:
Name:
Phone:
E-Mail:
1. What is the purpose of your new fuel
receipt activities? (indicate all that apply)
a. 10CFR50 Appendix
B.VII quality inspection?
b. Inspection for shipping damage and
foreign material?
c. Other (please specify):
2. Which organizations at your plant
perform the following functions relative to new fuel receipt?
a. Overall
new fuel receipt project management.
b. Ensuring adequate resources from other
groups (Security, Radiation Protection, etc.) are aligned for new fuel receipt.
c. Ensuring appropriate Preventative
Maintenance has been performed on new fuel receipt equipment (hoists, bridges,
etc.).
d. Providing supervision of craft
personnel (crane and bridge operators, mechanics, etc.) involved in new fuel
receipt.
d. Performing actual new fuel receipt
inspections.
e. Interfacing with the fuel vendor.
f. Generating fuel movement control
sheets or checklists.
g. Tracking Special Nuclear Material
(including processing of Material Transaction Reports).
h. Verifying integrity of shipping vehicle
and shipping container accelerometers.
3. What qualifications are required for
individuals performing inspections of new fuel during new fuel receipt? (indicate all that apply)
a. Part of reactor engineering
qualifications
b. Task-specific qualification card
c. ANSI N45.2.6-1978
d. Others (please specify):
4. What role does your site/fleet QA or QC
organizations play during new fuel receipt?
a. Performs
new fuel receipt inspections.
b. Qualifies
new fuel receipt inspectors.
c. Normal
QA/QC oversight of activities.
d. None.
e. Other
(please specify):