What do the other sites typically have for pcm differences in ECP actual vs. predicted?  Kewaunee recently had a MOL startup and we were about 175 pcm out from predicted, which is well within our procedural acceptance criteria of +/-400 pcm.  On the previous 2 startups at BOL, we were within 25 pcm of predicted.  What are typical values seen by other plants?


John Helfenberger,
Lead Reactor Engineer
Kewaunee Power Station
Phone: 920-388-8294
Dominion Tie-line: 8-691-8294
Pager: 920-704-4471


CONFIDENTIALITY NOTICE: This
electronic message contains information which may be legally
confidential and/or privileged and does not in any case represent a
firm ENERGY COMMODITY bid or offer relating thereto which binds the
sender without an additional express written confirmation to that
effect. The information is intended solely for the individual or
entity named above and access by anyone else is unauthorized. If
you are not the intended recipient, any disclosure, copying,
distribution, or use of the contents of this information is
prohibited and may be unlawful. If you have received this
electronic transmission in error, please reply immediately to the
sender that you have received the message in error, and delete it.
Thank you.