Oconee Nuclear Station operates
at 100%FP as indicated. The uncertainty in power is accounted for in the safety
analysis assumptions. The license condition for 2568 MWTh is interpreted as being
the as-indicated condition (which I believe is consistent with standard T.S.,
too … that the value in the T.S. is the as-indicated condition and the appropriate
analyses take into account uncertainties when ensuring the as-indicated value
is safe.)
Carl
Carl D. Fago
Reactor Engineering Supervisor
Oconee Nuclear Station
Duke Energy Carolinas
Phone: (864) 873-3047
Fax: (864) 873-3374
Email: Carl.fago@duke-energy.com
From: pwrrm@retaqs.com
[mailto:pwrrm@retaqs.com] On Behalf Of Adina K Lafrance
Sent: Thursday, January 21, 2010 8:43 AM
To: RETAQS (pwrrm@retaqs.com)
Subject: [Pwrrm] Measured power and uncertanties
Surry is trying to answer
a question this morning regarding power level indications and
uncertainties.
We are stating that within a
certain confidence level, that the calorimetric calculation will produce a
reactor power output (at RTP) from 98.8 to 101.2% with the rightly calibrated
process instrumentation in the calorimetric program (App K). Half the
time the operating power will be above 100%, half the time it will be below
100%. The opposing opinion is that if we have a 1.2% RTP uncertainty that
we operate at or below 98.8% so as to not exceed RTP. The uncertainties
in question relate to the plant computer-none of the redundant indications
indicate higher than RTP (most notably delta Ts). It is also noted that
we were told that no other site operates the way we are with regard to
uncertainties.
Can you please tell us how your
site operates with regard to uncertainties and your RTP?
Thank you in advance.
Adina
LaFrance
The significant problems we face cannot be solved at the same
level of thinking we were at when we created them. -Albert Einstein
Nuclear
Analysis & Fuel
Reactor
Engineer
Surry
Power Station
Email:
Adina.K.LaFrance@Dom.com
Phone:
757-365-2658
Pager
#: 4290
CONFIDENTIALITY NOTICE: This electronic message contains information
which may be legally confidential and or privileged and does not in any case
represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the
sender without an additional express written confirmation to that effect. The
information is intended solely for the individual or entity named above and
access by anyone else is unauthorized. If you are not the intended recipient, any
disclosure, copying, distribution, or use of the contents of this information
is prohibited and may be unlawful. If you have received this electronic
transmission in error, please reply immediately to the sender that you have
received the message in error, and delete it. Thank you.