FENOC would like to ask that each plant complete the following survey:

 

NEW FUEL RECEIPT INDUSTRY SURVEY

 

 

Plant: Turkey Point

 

Contact Information:

            Name: Mark Dicus

            Phone: 305-246-6185

            E-Mail: mark.dicus@fpl.com

 

1.         What is the purpose of your new fuel receipt activities?

            b.         Inspection for shipping damage and foreign material

2.         Which organizations at your plant perform the following functions relative to new fuel receipt?

            a.         Overall new fuel receipt project management.

                  Team effort between Reactor Engineering and Operations, both of whom are short-staffed.  The absence of a true project manager is an ongoing issue.

b.         Ensuring adequate resources from other groups (Security, Radiation Protection, etc.) are aligned for new fuel receipt.

                  Team effort between Reactor Engineering and Operations.

c.         Ensuring appropriate Preventative Maintenance has been performed on new fuel receipt equipment (hoists, bridges, etc.).

                  Operations.

d.         Providing supervision of craft personnel (crane and bridge operators, mechanics, etc.) involved in new fuel receipt.

                  Operations SRO supervises operators, and Mechanical Maintenance field supervisor supervises maintenance (maintenance crew used for unpacking only).

d.         Performing actual new fuel receipt inspections.

                  Reactor Engineers and vendor rep.

e.         Interfacing with the fuel vendor.

                  Reactor Engineering.

f.          Generating fuel movement control sheets or checklists.

                  Reactor Engineering.

g.         Tracking Special Nuclear Material (including processing of Material Transaction Reports).

                  Reactor Engineering (day to day tracking) and corporate fuel group (generate annual reports).

h.         Verifying integrity of shipping vehicle and shipping container accelerometers.

                  Reactor Engineering.

3.         What qualifications are required for individuals performing inspections of new fuel during new fuel receipt? (indicate all that apply)

            b.         Task-specific qualification card (which is part of Reactor Engineering quals)

4.         What role does your site/fleet QA or QC organizations play during new fuel receipt?

            c.         Normal QA/QC oversight of activities.