Question to Reactor Engineering Supervisors with respect to RIS 2007-021.
What type of time averaged values are used in your calorimetric program
(e.g. 1 minute average, 5 minute average, etc)? What type of time
averaging is used for either feed flow or steam flow which feeds your
calorimetric program? Which of the time average calorimetric values are
used to ensure compliance with your licensed thermal power limitations and
the intent of RIS 2007-021? Have you made changes to your calorimetric
procedures or methods as a result of the RIS? Is "Steady State" in
reference to licensed thermal power defined at your plant?
Michael J. Fanguy
Nuclear Analysis & Fuel
Lead Reactor Engineer
Surry Power Station
Email: Michael.Fanguy(a)Dom.com
Phone: 757-365-2155
Pager #: 3453
-----------------------------------------
CONFIDENTIALITY NOTICE: This electronic message contains
information which may be legally confidential and/or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect. The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized. If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful. If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it. Thank you.