Here are FCS's answers
1) What type of time averaged values are used in your calorimetric program
(e.g. 1 minute average, 5 minute average, etc)?
FCS uses a 10-minute average as the value used to monitor reactor power and compliance. There are other averages available for trouble-shooting and for information (real time calculate every 30 seconds, 2-minute average, 5-minute average, and others up to 8 hour averages)
2) What type of time averaging is used for either feed flow or steam flow which feeds your calorimetric program?
FCS has implemented a 2-minute average for Feedwater and S/G Blowdown flow.
3) Which of the time average calorimetric values are used to ensure compliance with your licensed thermal power limitations and the intent of RIS 2007-021?
FCS uses a 10-minute average as the value used to monitor reactor power and compliance.
4) Have you made changes to your calorimetric procedures or methods as a result of the RIS?
FCS has interim guidance not to exceed the license limit of 1500 MWth while at steady state conditions, with a target band of 1497-1499 MWth. We also clarified the term steady-state with respect to the rotation of secondary equipment. (we have 3 Main Feed, 3 Condensate and 3 heater drain pumps). The 10-minute average for secondary calorimetric would indicate a ~5-6 MWth increase during the start of the standby feed pump, and then return to normal once the running pump is secured.
We have told the SRO/RO's to declare the calculation invalid and rely on NI and delta-T power during this timeframe. (It usually takes 10-12 minutes to settle back out).
5) Is "Steady State" in reference to licensed thermal power defined at your plant?
YES
----------------------------------------------------
Joseph E. Willett, P.E.
Principal Reactor Engineer-Fuel
Nuclear Operations Division
E-mail: jwillett@oppd.com
Omaha Public Power District Phone: (402) 533-7213
P.O. Box 99 Pager: (402) 561-3899
Ft. Calhoun, NE 68023-0390 FAX: (402) 533-6747
Mail Station: FC-1-1 Plant
---------------------------------------------------- --------
-----Original Message-----
From: respvr-bounces@retaqs.com [mailto:respvr-bounces@retaqs.com] On Behalf Of respvr-request@retaqs.com
Sent: Friday, September 28, 2007 11:00 AM
To: respvr@retaqs.com
Subject: Respvr Digest, Vol 15, Issue 4
Send Respvr mailing list submissions to
respvr@retaqs.com
To subscribe or unsubscribe via the World Wide Web, visit
http://www.keffective.com/mailman/listinfo/respvr
or, via email, send a message with subject or body 'help' to
respvr-request@retaqs.com
You can reach the person managing the list at
respvr-owner@retaqs.com
When replying, please edit your Subject line so it is more specific
than "Re: Contents of Respvr digest..."
Today's Topics:
1. RIS 2007-021 Compliance (Michael.Fanguy@dom.com)
----------------------------------------------------------------------
Message: 1
Date: Thu, 27 Sep 2007 16:02:47 -0400
From: Michael.Fanguy@dom.com
Subject: [Respvr] RIS 2007-021 Compliance
To: "RE Supervisors" <respvr@retaqs.com>
Cc: Johnny.Henderson@dom.com, James.Shell@dom.com
Message-ID:
<OF5285CA8E.41505F13-ON85257363.006C2B91-85257363.006E1E8F@dom.com>
Content-Type: text/plain; charset="us-ascii"
Question to Reactor Engineering Supervisors with respect to RIS 2007-021.
What type of time averaged values are used in your calorimetric program
(e.g. 1 minute average, 5 minute average, etc)? What type of time
averaging is used for either feed flow or steam flow which feeds your
calorimetric program? Which of the time average calorimetric values are
used to ensure compliance with your licensed thermal power limitations and
the intent of RIS 2007-021? Have you made changes to your calorimetric
procedures or methods as a result of the RIS? Is "Steady State" in
reference to licensed thermal power defined at your plant?
Michael J. Fanguy
Nuclear Analysis & Fuel
Lead Reactor Engineer
Surry Power Station
Email: Michael.Fanguy@Dom.com
Phone: 757-365-2155
Pager #: 3453
-----------------------------------------
CONFIDENTIALITY NOTICE: This electronic message contains
information which may be legally confidential and/or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect. The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized. If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful. If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it. Thank you.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.keffective.com/pipermail/respvr/attachments/20070927/777f7633/attachment-0001.html
------------------------------
_______________________________________________
Respvr mailing list
Respvr@retaqs.com
http://www.keffective.com/mailman/listinfo/respvr
End of Respvr Digest, Vol 15, Issue 4
*************************************
This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient. Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, nor acceptance. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. |