Question to Reactor Engineering Supervisors with respect to RIS 2007-021.
What type of time averaged values are used in your calorimetric program (e.g. 1 minute average, 5 minute average, etc)? What type of time averaging is used for either feed flow or steam flow which feeds your calorimetric program? Which of the time average calorimetric values are used to ensure compliance with your licensed thermal power limitations and the intent of RIS 2007-021? Have you made changes to your calorimetric procedures or methods as a result of the RIS? Is "Steady State" in reference to licensed thermal power defined at your plant?
Michael J. Fanguy Nuclear Analysis & Fuel Lead Reactor Engineer Surry Power Station Email: Michael.Fanguy@Dom.com Phone: 757-365-2155 Pager #: 3453
----------------------------------------- CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.