Seabrook
Dilute, withdraw s/d banks, withdraw control banks
Paul Gurney
Hugh_E_McKenney@d om.com To: respvr@retaqs.com Sent by: cc: respvr-bounces@re Subject: [Respvr] Start Up sequence taqs.com
05/18/2006 09:18 AM Please respond to "RE Supervisors"
RE Supervisors,
Does your plant normally start up (non RFO) by withdrawing shutdown banks first, then diluting the RCS to the estimated critical rod position (Cb) then withdrawing control rods to critical?
or
Does your plant normally start up by first diluting the RCS to the estimated critical rod position (Cb), then withdrawing shutdown banks, then withdrawing control rods to critical?
Thanks
Hugh McKenney Dominion Resources Services, Inc. Reactor Engineering Supervisor Phone: 8-759-2359 or 860 447-1791 x2359 Email: Hugh_E_McKenney@Dom.com
----------------------------------------- CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.