For those of you that currently use BEACON-TSM, what was your transition plan for going from your old system to BEACON-TSM? Did you run both systems in parallel for a certain amount of time? We currently use BEACON-Incore and are wondering if we need to run an Incore model on a separate computer at the same time we are running the TSM model on the new computer.
Thank you in advance for your input.
Kara Gibson Xcel Energy | Responsible By Nature Reactor Engineer 1717 Wakonade Dr. East Welch, MN 55089 P: 651.388.1121 x4719 F: 612.330.5743 E: kara.gibson@xenuclear.commailto:kara.gibson@xenuclear.com ________________________________________________ blocked::blocked::http://www.xcelenergy.com/XCELENERGY.COMhttp://www.xcelenergy.com/ Please consider the environment before printing this email