If so could you provide some details as to flow path, amount injected, if constant or periodic injection and any other info you can share. Thanks
Ken Pike (610) 277-8991 Ext.253
Beaver Valley response
Beaver Valley Unit 1 has been injecting zinc since 2003. Injection target is currently 15 ppb in RCS and is started as soon as we startup (as long as silica is less than 1000 ppb and nickel is less than 6 ppb). Zinc addition is terminated 14 days prior to a planned shutdown to Mode 5. Unit 1 originally injected zinc at 30 ppb following Steam Generator replacement in order to passivate the new metal surfaces. The zinc levels were reduced a few cycles ago, and termination criteria of 14 days is also being reduced to 2 days.
Beaver Valley Unit 2 has been injecting zinc since 2010. Injection target is 5 ppb in RCS and is started as soon as we startup (as long as silica is less than 1000 ppb and nickel is less than 2 ppb). Zinc addition is terminated 2 days prior to a planned shutdown to Mode 5.
Injection for both units is through a skid and the Chemical and Volume Control System via suction header of the charging pumps.
Anthony (A.R.) Burger Supervisor, Reactor Engineering FENOC - Beaver Valley Power Station Phone: (724) 682-4108 Cell: (724) 601-3224 FAX: (724) 682-4250 Email: aburger@firstenergycorp.com
From: "Kenneth R Pike" kpike01@comcast.net To: pwrrm@retaqs.com Date: 08/10/2012 11:44 AM Subject: [Pwrrm] Any US PWRs using zinc injection in primary coolant? Sent by: pwrrm@retaqs.com
If so could you provide some details as to flow path, amount injected, if constant or periodic injection and any other info you can share. Thanks
Ken Pike (610) 277-8991 Ext.253_______________________________________________ PWRRM mailing list PWRRM@retaqs.com http://www.keffective.com/mailman/listinfo/pwrrm
----------------------------------------- The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.