Does your station have water clarity or lighting standards for core inspections? (FOSARs, alignment checks, ID verifications, etc.) At Oconee Nuclear Station we only have qualitative standards (procedure and PJB directs the inspector to ensure there is adequate clarity and lighting).
Thanks,
Carl
Carl D. Fago Reactor Engineering Supervisor Oconee Nuclear Station Duke Energy Carolinas Phone: (864) 873-3047 Fax: (864) 873-3374 Email: Carl.fago@duke-energy.commailto:Carl.fago@duke-energy.com
It is a subjective call by the operators performing fuel moves. For inservice inspections the inspectors have a sample that they put into the core and are required to be able to read it with their cameras.
________________________________ From: respvr@retaqs.com [mailto:respvr@retaqs.com] On Behalf Of Fago, Carl D Sent: Wednesday, March 31, 2010 7:10 AM To: respvr@retaqs.com Subject: [Respvr] Water Clarity and Lighting Standards for Core Inspections
Does your station have water clarity or lighting standards for core inspections? (FOSARs, alignment checks, ID verifications, etc.) At Oconee Nuclear Station we only have qualitative standards (procedure and PJB directs the inspector to ensure there is adequate clarity and lighting).
Thanks,
Carl
Carl D. Fago Reactor Engineering Supervisor Oconee Nuclear Station Duke Energy Carolinas Phone: (864) 873-3047 Fax: (864) 873-3374 Email: Carl.fago@duke-energy.commailto:Carl.fago@duke-energy.com
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
Carl,
Refueling SRO and RE ultimately determine if clarity is acceptable, which is obviously a little bit subjective. Our procedure states for offload, we need to see the top nozzles and for reload we need to see the alignement pins on the lower core plate. We have no stated clarity requirements for FOSAR or fuel inspections.
Paul V. Gurney Reactor Engineering Supervisor Seabrook Station 603-773-7776
From: respvr@retaqs.com [mailto:respvr@retaqs.com] On Behalf Of Fago, Carl D Sent: Wednesday, March 31, 2010 7:10 AM To: respvr@retaqs.com Subject: [Respvr] Water Clarity and Lighting Standards for Core Inspections
Does your station have water clarity or lighting standards for core inspections? (FOSARs, alignment checks, ID verifications, etc.) At Oconee Nuclear Station we only have qualitative standards (procedure and PJB directs the inspector to ensure there is adequate clarity and lighting).
Thanks,
Carl
Carl D. Fago Reactor Engineering Supervisor Oconee Nuclear Station Duke Energy Carolinas Phone: (864) 873-3047 Fax: (864) 873-3374 Email: Carl.fago@duke-energy.commailto:Carl.fago@duke-energy.com
Carl - we have nothing formal. Sounds like we have similar qualitative opinions - e.g. are the core pins (pads) visible, can you easily see the serial number, etc. Bill Herwig
From: respvr@retaqs.com [mailto:respvr@retaqs.com] On Behalf Of Fago, Carl D Sent: Wednesday, March 31, 2010 7:10 AM To: respvr@retaqs.com Subject: [Respvr] Water Clarity and Lighting Standards for Core Inspections
Does your station have water clarity or lighting standards for core inspections? (FOSARs, alignment checks, ID verifications, etc.) At Oconee Nuclear Station we only have qualitative standards (procedure and PJB directs the inspector to ensure there is adequate clarity and lighting).
Thanks,
Carl
Carl D. Fago Reactor Engineering Supervisor Oconee Nuclear Station Duke Energy Carolinas Phone: (864) 873-3047 Fax: (864) 873-3374 Email: Carl.fago@duke-energy.commailto:Carl.fago@duke-energy.com